What is the CTG Port Authority Charge
When importer or exporter fail to clearance their goods port claim minimum or maximum charge against on container amount & how many days stay container in the port which called Port Authority Charge. At the present time various type of port & others movement charge available.Now here showing for better information.
·
Schedule of Charges
Particulars of Charges
|
Basis of Charges
|
Rates Not Exceeding 21 feet length
|
Rates Exceeding 21 feet length
|
Wholly
using CPA equipment:
|
|||
(a) FCL
Container
|
Per
Container
|
US$
43,40
|
US$
65,10
|
(b) LCL
Container
|
-do-
|
US$
130,00
|
US$
195,00
|
(c)
Empty Container
|
-do-
|
US$
22,10
|
US$
33,20
|
·
Storage Charge, Containers and Non-CPA
Equipment:
Storage Charges
|
Basis of Charges
|
Rates Not Exceeding 21 ft. length
|
Rates
Exceeding
21 ft. but not exceeding
41 ft length
|
RatesExceeding 41 feet length
|
Loaded
Container:
|
||||
(a)
First 7th days
|
Per
Container,
|
US$ 6,00
|
US$ 12,00
|
US$ 18,00
|
(b)
From the 8th to the 20th days
|
per
diem or
|
US$ 12,00
|
US$ 24,00
|
US$ 36,00
|
(c) For
each subsequent day
|
part
thereof
|
US$ 24,00
|
US$ 48,00
|
US$ 72,00
|
Empty
Container:
|
||||
(a)
First 7th days
|
-do-
|
US$ 6,00
|
US$ 12,00
|
US$ 12,00
|
(b)
From the 8th to the 20th days
|
US$ 12,00
|
US$ 24,00
|
US$ 36,00
|
|
(c) For
each subsequent day
|
US$ 24,00
|
US$ 48,00
|
US$ 72,00
|
·
Accounts Officer (Bill Revenue) Empty
Container
Particulars of Charges
|
Basis of Charges
|
Rates Not Exceeding 21 ft. lenght
|
Rates Exceeding 21 ft. lenght
|
(a)
Import
|
Per
container do
|
Tk. 102,00
|
Tk. 204,00
|
(b)
Export
|
-do-
|
Tk. 102,00
|
Tk. 204,00
|
·
Stuffing/Unstuffing
Particulars of Charges
|
Basis of Charges
|
Rates
|
Stuffing
Unstuffing
|
Per
1000 kg. or part thereof of contents
|
Tk.
300,00
|
-do-
|
Tk.
300,00
|
·
Change of Status
Particulars of Charges
|
Basis of Charges
|
Rates
|
Change
of Status
|
Per
Container per change
|
US$
10,00
|
·
Lift on / Lift off Charges
Particulars of Charges
|
Basis of Charges
|
Rates Not Exceeding 21 ft. lenght
|
Rates Exceeding 21 ft. lenght
|
Lift on
/ lift off charge, Loaded container
|
per
container
|
Tk. 1000,00
|
Tk. 1500,00
|
Lift on
/ lift off charge, empty container
|
-do-
|
Tk. 375,00
|
Tk. 562,50
|
·
Jetty Crane Charges
Description of Charges
|
Basis of Charges
|
Rates
|
(a) Use
of Jetty crane
|
Per
crane, per period of 8 hours or part thereof
|
US$
42,00
|
(b) If
jetty crane not used
|
-do-
|
US$
20,10
|
Storage Facilities: Port Storage Information mentioned for extra information.
Total floor space
|
Quantity
|
Floor Area (m2)
|
Main
Quay Transit Sheds
|
9
|
52.000
|
Car
Sheds
|
2
|
5.000
|
Open
Dumps
|
-
|
90.000
|
Customs
Warehouses
|
4
|
26.700
|
You have given great content here.freight forwarder miami I am glad to discover this post as I found lots of valuable data in your article. Thanks for sharing an article like this.
ReplyDelete